- Materials
- S235JR / S355J2 — rolled IPE, HEA, HEB, UPN sections, rectangular hollow sections, welded plate sections
- Certificates
- 3.1 material certificates per batch, traceability by piece
- Welding
- MIG / MAG jig welding, visual inspection and on request NDT (PT / UT)
- Connections
- HR 8.8 / 10.9 bolts, CNC drilling in the workshop, no site welding
- Protection
- Hot-dip galvanising · Sa 2½ blasting + epoxy primer + RAL polyurethane · duplex · shop primer
- Loads
- Per structural design: snow, wind, seismic, technological loads (overhead crane, equipment)
- Batches
- From a few parts to hundreds of tonnes, delivered by erection phase
- Lead time
- Shop drawings 1–2 weeks · fabrication 3–8 weeks, in phases